2015-02-21

Driving home

Driving homeLeft Right
The difference in weather at the two ends of the 17 km long Gotthard road tunnel. The temperature in the middle of the tunnel reached 21,5 C!
Camera:
Exposure time:
Aperture:
Focal length:
ISO:

Copyright © 2015 Bogna Murkowska